Flat roof specialist

Completed Domestic Flat Roofs Construction Pictures

The following picture show typical examples of completed domestic flat roofs, being fully bonded, mechanically attached and the ballasted system. Any flat roof construction is suitable for EPDM such as commercial applications like schools, offices and factories.

To enlarge the pictures below, please double click on the image

Extension flat roof showing laid EPDM ready to be secured by ballast Flat roof with Ballast showing the membrane fall into the guttering Completed ballasted flat roof kitchen extension with aluminium edge trims Flat roof house extension showing clearly EPDM flashing into the brick walll Patio where the flags lay over the membrane with the EPDM flashing clearly visible Double flat roof ballasted garage with the apron fall into the guttering finished off with edge trim Flat roof extension building fitted with the fully bonded EPDM membrane system


Garage Flat Roof Ballasted System Installation

The sequence of pictures below show a ballasted system being fitted to an old worn out leaking felt roof. In this instance, the old felt does not have to be removed thus saving labour and costs. The whole roof is first cleaned of any debris, chippings and loose material then the geotextile is rolled out to cover the whole base and secured by tacks or staples. The EPDM rubber membrane sheet is then pulled squarely over the entire roof and the overhangs draped down the sides. After about 10 – 15 minutes, after it has adjusted to the ambient temperature, it can be adhered down onto the facia boards and finished by fixing the aluminium edge trims round the perimeters.
Old felt roof to be renovated is swept clean of all debris and loose chippings
Side angled shot of the existing felt roof showing worn out condition   Front angled shot of the existing felt roof showing worn out condition
Geotextile underlay being laid on the old felt and tacked into position
Rolled out underlay partial fitting to extents of the flat roof
Underlay fitted to extents of the flat roof extending to all edgesRolled out underlay completion fitting to extents of the flat roof EPDM is now pulled over the full area of the roof and draped over all sides
EPDM being laid on top of the underlay making sure it is square with the garage   EPDM laid to extents of roof on top of the underlay ready to be adhered down onto the facia boards
EPDM in position, with edge trims fitted and bags of ballast waiting to secure the membrane against wind
The Rubber membrane has now been adhered to the facia boards and the edge trim is near completion   The EPDM rubber membrane flat roof covering is now completed with all edge trims fitted to perimeters